Manufacturing Essential Asset 1 (MEA 1) — USMGC Manufacturing Facility

Fully subscribedIndustrial
Talk to a 1031 specialistData updated Jan 24, 2024
Offering size$182.1M
Asset typeIndustrial
LocationMulti-state
FinancingNot disclosed
Regulation D exemptionRule 506(c)
Sponsor-reported potential 721/UPREIT exitNo
First filedApr 11, 2023
Last filedJan 24, 2024
Minimum$100k

DST interests are illiquid private securities. You may lose some or all of your investment. Distributions, tax treatment, and exit timing are not guaranteed. Review the current Private Placement Memorandum before investing.

Documented outcome

Outcome not yet confirmed

In March 2024, CAI Investments converted the original $182 million Manufacturing Essential Asset (MEA 1) DST offering into a Reg. D 506(c) offering, abandoning the DST structure rather than selling the property or completing a traditional full cycle; the 506(c) raise was reported fully subscribed by March 2026.

Manufacturing Essential Asset 1 (MEA 1) — USMGC Manufacturing Facility property
SEC filing recordMatched to public SEC filings
First filedApr 11, 2023
Latest filingJan 24, 2024
Filings tracked2
View filing on SEC EDGAR

Form D is an issuer notice filing. A filing does not mean the SEC approved, endorsed, or verified the offering.

In the news

Frequently asked questions

Is Manufacturing Essential Asset 1 (MEA 1) — USMGC Manufacturing Facility currently active?

Manufacturing Essential Asset 1 (MEA 1) — USMGC Manufacturing Facility is part of the researched historical archive. “Active” reflects the latest public record and does not confirm that interests remain available.

Where does Top1031 get the data for Manufacturing Essential Asset 1 (MEA 1) — USMGC Manufacturing Facility?

Top1031 tracks this offering from SEC Form D filings and cited sponsor disclosures. Filing data may lag current subscriptions and does not mean the SEC approved or verified the offering.